101-726
Explanation: The system hung while trying to configure an unknown resource.
1. Run the stand-alone diagnostics problem determination procedure.
2. If the problem remains, refer to Failing function codes to find the FFC that matches the last three digits of the
SRN.
3. Suspect the device adapter or device itself.
Response:
Failing Item:
v FFC_726
101-888
Explanation: The system does not IPL. Go to Performing the checkout procedure or undetermined problem
procedure.
Response:
Failing Item:
v FFC_210
v FFC_227
103-151
Explanation: The time-of-day battery failed.
1. Go to Removing the battery to start the battery replacement procedure.
2. Go to Installing the battery to complete the procedure.
Response:
Failing Item:
v FFC_151
109-200
Explanation: The system crashed while you running it.
1. Go to Performing the checkout procedure.
2. If the 8-digit error and location codes were NOT reported, run AIX diagnostics in problem determination
procedure and record and report the 8-digit error and location codes for this SRN.
Response:
101-726 109-200
306 Power Systems: IBM Flex System p260 and p460 Compute Nodes Installation and Service Guide