EasyManuals Logo

IBM Flex System p260 User Manual

IBM Flex System p260
524 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #69 background imageLoading...
Page #69 background image
6. Carefully open the retaining clips (A) on each end of the DIMM connector by pressing them in the
direction of the arrows. Remove the DIMM (B).
7. Install a DIMM filler (C) in any location where a DIMM is not present to avoid machine damage.
Note: Before you replace the compute node cover, ensure that you have at least the minimum
DIMM configuration installed so that your compute node operates properly.
8. If you are instructed to return the DIMM, follow all packaging instructions, and use any packaging
materials for shipping that are supplied to you.
9. Install and close the compute node cover. See “Installing and closing the compute node cover” on
page 41.
Statement 21
CAUTION:
Hazardous energy is present when the compute node is connected to the power source. Always
replace the compute node cover before installing the compute node.
10. Install the compute node into the IBM Flex System Enterprise Chassis. See “Installing the compute
node in an IBM Flex System Enterprise Chassis” on page 93.
Figure 25. Removing a DIMM
Chapter 6. Installing and removing components 57

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Flex System p260 and is the answer not in the manual?

IBM Flex System p260 Specifications

General IconGeneral
BrandIBM
ModelFlex System p260
CategoryServer
LanguageEnglish

Related product manuals