Table 5. Steps for different installation scenarios (continued)
New system (control
enclosure only)
New system (control
enclosure and one or more
expansion enclosures)
Adding expansion
enclosures to an existing
system
“Review enclosure location
guidelines” on page 16
“Review enclosure location
guidelines” on page 16
“Installing the support rails”
on page 19
1
“Installing the support rails”
on page 19
“Installing the support rails”
on page 19
“Installing the enclosures” on
page 24
1
“Installing the enclosures” on
page 24
“Installing the enclosures” on
page 24
“Connecting SAS cables to
expansion enclosures” on
page 41
1
“Connecting Ethernet cables
to node canisters” on page
44
“Connecting SAS cables to
expansion enclosures” on
page 41
“Powering on the system” on
page 50
1
“Connecting Fibre Channel
cables to Fibre Channel host
interface adapter” on page 47
“Connecting Ethernet cables
to node canisters” on page
44
“Adding an expansion
enclosure to an existing
system” on page 62
“Powering on the system” on
page 50
“Connecting Fibre Channel
cables to Fibre Channel host
interface adapter” on page 47
Chapter 3, “Configuring the
system,” on page 53
“Powering on the system” on
page 50
Chapter 3, “Configuring the
system,” on page 53
1
Complete these steps for each expansion enclosure that you add.
Be familiar with the following information
v See “Caution notices for the Storwize V3700” on page x and “Danger notices for
Storwize V3700” on page xii for a summary of the situations that can be
potentially hazardous to you. Before installing, read and understand the
following caution and danger statements.
2 Storwize V3700: Quick Installation Guide
4
4
4
4
4
4