1. Maintenance Schedule
Disconnect power for all steps unless necessary for inspection of component
functionality. Do not operate machine without guards in place.
The maintenance schedule shown is a suggested timetable based on a single shift five day
week operation under normal operating conditions. Schedule should be accelerated when
operating under multi-shift or harsh environments. Blank lines have been provided for
additional items as required. See the print engine manual for recommended print engine
maintenance schedule.
Clean adhesive residue from web
path
Check belts and bearings for wear
Inspect Hoses and Fittings
Clean platen roller and printhead