EasyManua.ls Logo

Isuzu NPR 4J Series - Exhaust Manifold Installation

Isuzu NPR 4J Series
406 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4JB1/4JB1T/4JB1TC/4JG2 – ENGINE 6A1 – 11
INSTALLATION
5. Exhaust Manifold
Tighten the fixing nuts and bolts to the specified
torque.
Manifold Bolt Torque Nm(kgm/lbft)
26 (2.7/20)
4. Heat Protector
Remove the heat protector and tighten to the specified
torque.
Heat Protector Bolt Torque Nm(kgm/lbft)
19 (1.9/14)
3. Front Exhaust Pipe Stay Bolt
Tighten the fixing bolts to the specified torque.
Stay Bolt Torque Nm(kgm/lbft)
40 (4.1/30)
2. Front Exhaust Pipe Nut
Tighten the fixing nuts to the specified torque.
Without Exhaust Brake Nm(kgm/lbft)
69 (7/51)
With Exhaust Brake Nm(kgm/lbft)
69 (7/51)
1. Vacuum Hose (Exhaust Brake Model)
Install the two hose a vacuum actuator.
Connect battery ground cable.
Start the engine and check coolant leakage.

Table of Contents

Related product manuals