Inspection and Installation
2 Inspection and Installation
♦ Verifying the Shipment
♦ Instrument Size Introduction
♦ Connecting the Power Cord
♦ Connecting the Device Under Test (DUT)
♦ Remote Interface Connection
2.1 Verifying the Shipment
Unpack the box and check the contents before operating the instrument. If
wrong items have been delivered, if items are missing, or if there is a defect with
the appearance of the items, contact the dealer from which you purchased the
instrument immediately.
The package contents include:
Item
Qty.
Model Remarks
High power Program-
mable DC Power
Supply
x1 IT-M3900D
Series
For the specific models in-
cluded in this series, refer
to 1.1 Brief Introduction.
Power cord x1 - Depending on the instru-
ment model.
For details, see 2.3 Con-
necting the Power Cord.
USB communication
cable
x1 - This accessory is se-
lected when the USB in-
terface is used for starting
up remote operation.
Ex-factory Test
Report
x1 - It contains the test report
and calibration report of
the instrument before
delivery.
Upon verification of the shipment, keep the package and relevant contents
thereof in a safe place. When returning the instrument for warranty service or
repair, the specified packing requirements shall be met.
Copyright © Itech Electronic Co., Ltd.
18