Inspection and Installation
2 Inspection and Installation
♦ Verifying the Shipment
♦ Instrument Size Introduction
♦ Rack Mounting
♦ Connecting the Power Cord
♦ Connecting the Device Under Test (DUT)
♦ Connecting the Interface
2.1 Verifying the Shipment
Unpack the box and check the contents before operating the instrument. If
wrong items have been delivered, if items are missing, or if there is a defect with
the appearance of the items, contact the dealer from which you purchased the
instrument immediately.
Table 2–1 Package box contents
Item
Qty.
Model Remarks
Programma-
ble AC Power
Source
- IT7200
series
This series include: IT7221/IT7222
Power Cord X 1 - User may select an appropriate power
cord that matches the specifications of
power socket used in the area. See the
Section 2.4 Connecting the Power
Cord for details.
Ex-Factory
Test Report
X 1 - It is the test report of the instrument be-
fore delivery.
Upon verification of the shipment, keep the package and relevant contents
thereof in a safe place. When returning the instrument for warranty service or
repair, the specified packing requirements shall be met.
Copyright © Itech Electronic Co., Ltd.
14