i
07610-003-60-98-L
Revision
Letter
Revision
Date
Made by Applicable ECNs Details
A 1-19-09 JC Process Initial release of manual.
B 1-30-09 JC Process Added 15 kW heater option and adjusted amperage ratings.
C 10-6-09 RC N/A Added curtain installation diagram.
D 10-9-09 ARL 8044
Changed the part from a weldment (05700-021-67-50) to a casting
(09515-003-58-12).
E 12-1-09 ARL 091125-1404-CW
Changed a dimension on pg. 30, the dimension between the mount-
ing holes was indicated as 2.00”, but should have been 2.88”.
F 10-29-10 RLC 101029-1336-CW Updated Print for mounting Table Limit Switch.
G 5-9-12 RLC QOF 386
Added chart for cut lengths on 66,76,80, and 90 L-R drain
plumbing.
H 3-19-13 RLC QOF NDB-219 Updated manufacturer information.
J 10-13-14 KAP N/A Updated manufacturer logo and information.
K 8-17-17 JH 8509
Updated manual to new format.
Audited manual and made corrections throughout.
Changed AJX-44/54 Drain Plumbing Assembly.
L 10-25-19 JH QOF 18-022
Complete revision of manual.
Added electrical requirements for available 380 V machines.
Changed steam pressure to 10–30 PSI.
Updated Item #7 on Motor page.
Added 15 kW heater gasket on Heater page.
Updated Item #11 on Curtains/Conveyor Switch page.
Changed curtain rod P/N on pg. 79.
REVISION HISTORY