EasyManua.ls Logo

Komatsu PC400 - Page 128

Komatsu PC400
262 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13. TRANSPORTATION
13.6 PROCEDURE FOR INCREASING OR
REDUCING TRACK FRAME GAUGE
a
WARNING
Never use the machine for operations with the track frame
retracted.
REDUCING TRACK GAUGE
2.
3.
4.
5.
6.
Remove center frame mounting bolts 0. (one side, front + rear:
18 bolts)
Center trame
Swing the upper structure to the track frame
side to be
retracted until the upper structure is at a right angle to the tracks.
Then, jack up the track frame, making use of the work equip-
ment.
Put the block (20 to 30 cm (8 to 12 in) square) from outside of
track frame @. Using the boom cylinder, slowly lower the
machine until the track frame reaches the stoppers.
Lower the machine carefully and install bolts 0. (one side, front
+ rear: 8 bolts out of bolts 0)
Tightening torque: 1715 f 200 Nm
(175 + 20 kgm, 1275 f 145 Ibft)
Remove steps @ (front and rear) at the side of the track frame.
Followthe same procedure to retract the track frame on the other
. .
srae.
e
AE098220
2-82

Table of Contents