5 Installation at Site
23 of 96
Sewatec
5. Insert threaded rods into the corresponding drilled holes with an electric tool
(e.g. impact drill, hammer drill).
6. After the curing time (see table), tighten the chemical anchors (4) evenly and
tightly.
7. Grout the baseplate using low-shrinkage concrete.
Chemical anchor
dimensions
t
2
t
1
S
W
1
d
1
SW
2
d
2
l
1
Fig.4: Dimensions
Table10: Chemical anchor dimensions
Size
(d
1
×l
1
)
d
2
t
1
t
2
SW
1
4)
SW
2
4)
M
d1
[mm] [mm] [mm] [mm] [mm] [Nm]
M10×130 12 22 90 17 6 20
M12×160 14 25 110 19 8 40
M16×190 18 35 125 24 12 60
M20×260 25 65 170 30 14 120
M24×300
5)
28 65 210 36 17 180
M30×380
5)
35 65 280 46 - 400
5.3 Installing the pump set in a vertical position
Fig.5: Preparing the foundation
4) SW = Width across flats
5) Mounting accessories of the respective manufacturer are required.