6.3 Shutdown
1. Slowly close the shut-off element on the discharge side.
2.
Switch off the motor immediately after closing the shut-off element.
NOTE
To make sure that the pump set is always ready for instant start-up, start up the
pump set approximately every 2 weeks for approximately 5 minutes during
prolonged shutdown periods.
6 Commissioning/Start-up/Shutdown
44 of 64
UPA, UPZ, BSX