SERVICE WORK ON THE CHASSIS 13
55
–
Tighten screw
2
.
Guideline
Screw, top triple
clamp
M8 20 Nm
(14.8 lbf ft)
–
Tighten screws
1
.
Guideline
Screw, top triple
clamp
M8 20 Nm
(14.8 lbf ft)
Finishing work
– Check the steering head bearing play. ( p. 53)
– Remove the motorcycle from the lift stand. ( p. 46)
13.13 Lubricating the steering head bearing
H02387-01
– Remove the lower triple clamp. ( p. 50)
– Install the lower triple clamp. ( p. 51)
Info
The steering head bearing is cleaned and lubricated in
the course of removal and installation of the lower triple
clamp.
13.14 Removing the start number plate
M01681-10
–
Remove screw
1
.
– Unhook the start number plate from the brake line and remove
it.
13.15 Installing the start number plate
M01682-10
– Attach the start number plate to the brake line.
– Position the start number plate.
Holding lugs
1
engage in the fender.