EasyManua.ls Logo

L-Acoustics A10 - Page 93

L-Acoustics A10
143 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging procedures
3. Secure another KS21 on the assembly.
Align the runners with the tracks.
SHLAK!
4. Repeat until the stack is complete.
Final check
Visually check that no yellow labels are visible.
Manually check that all linking points are secured.
5. Disengage the brakes and position the stack at its nal position.
6. Block the stack using both brakes.
A10 owner's manual (EN) version 1.1 93

Table of Contents

Related product manuals