16
Instructions for Use V 1.9 RevC - 06/2013
4. Instrument Setup
4.3 Unpacking and installation
Fig. 8
Fig. 9
1
2
3
4
4
4
4
5
• Loosenand unscrewthesix upper
screws (2).
• Removethecover(1).
• Taketheaccessorycarton(optional
accessories) (3) and the cartons (4)
from the standard scope of delivery.
The transport crate and includ-
ed retaining elements should
be kept in case a return ship-
ment is necessary later.
When the instrument is delivered, check the tilt indicators on the
packaging.
If the arrowhead is blue, the shipment was transported laying
flat, was tilted at too great an angle or fell over during transport.
Note this on the shipping documents and check the shipment for
possible damage.