EasyManua.ls Logo

LEMKEN Karat 9 - Three-Point Linkage Compatibility

LEMKEN Karat 9
83 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparation of the Tractor
32
6 PREPARATION OF THE TRACTOR
6.1 Tyres
The pressure - especially in the rear tractor tyres - must be equal. In heavy condi-
tions it may be necessary to add wheel weights and/or water ballast. (See manu-
facturer’s instructions).
6.2 Lift Rods
Adjust lift rods to equal length. (See manufacturer’s instructions).
6.3 Check Chains or Sway Blocks of the Three Point Linkage
Check chains or sway blocks MUST be adjusted so that the lower links are always
free to move sideways during working.
6.4 Required power sources
The following power sources are required on the tractor for the electrical consum-
ers:
Consumer Volt Direct connection
to the tractor bat-
tery
Power socket
Lighting system 12 - In accordance with
DIN-ISO 1724
CAUTION
Damage to electrical components
The tolerance range for the power supply is between 10 V and 15
V. Overvoltage and undervoltage may result in malfunctions and
under certain circumstances may destroy electrical or electronic
components.
Ensure that the power supply of the device is always within the
specified tolerance range.

Table of Contents

Related product manuals