EasyManua.ls Logo

LEMKEN Karat 9 - Top Link; Mounting Position

LEMKEN Karat 9
83 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Coupling and uncoupling
44
7.4 Top link
7.4.1 Mounting position
The top link (1) can be mounted in several
positions on the three-point tower (2). A
total of four mounting positions are pro-
vided. Select a lower mounting position for
the top link (1)
to improve the infeed of the device
to relieve the load on the front axle of the
tractor
to increase the roller pressure
to reduce the lifting force requirement
Select a higher mounting position for the top link (1)
to increase the lifting height
to reduce the slippage
to reduce the roller pressure
2 1

Table of Contents

Related product manuals