EasyManua.ls Logo

LEMKEN Karat 9 - Torque Specifications

LEMKEN Karat 9
83 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance and repairs
74
12.3 Maintenance intervals
12.3.1 After the initial start-up (at the latest after 2 hours)
Check What to do?
Wheel nuts
Retighten all wheel nuts to the appropriate torque. See
section entitled "Tightening torques".
Screw connections
Retighten all other bolts and nuts on the device to the
appropriate torque. See section entitled "Tightening
torques".
12.3.2 Daily inspection
Check What to do?
Tyres
Check the tyres for damage and wear.
Check the air pressure and, if required, correct.
See section entitled "Tyres and air pressure".
Hydraulic hoses
Check hydraulic hoses for damage and leaks. Imme-
diately replace damaged or defective hydraulic hoses.
The hydraulic hoses must be replaced at the latest 6
years after the date of manufacture. Use hydraulic ho-
ses authorised by LEMKEN only.
Safety equipment
Check that the safety equipment functions properly.
See section entitled "Safety equipment".
Soil processing tools
Check all soil processing tools for damage and wear.
Replace damaged or worn components.

Table of Contents

Related product manuals