5 Commissioning
This chapter contains informaon on how to commission and integrate the controller into an
automaon system.
Required accessories
Engineering PC with »PLC Designer« installed.
Standard network cable
5.1 Installaon of »PLC Designer«
For the installaon, download the »PLC Designer« from the download area on the Lenze
homepage to your PC and run the setup le.
www.Lenze.com à Downloads
5.2 Commissioning
Recommended sequence of the commissioning steps
1.
4Connect controller and Engineering PC ^ 16
2.
4Set IP address on the PC ^ 16
3.
4Start controller ^ 17
4.
4Create PLC program ^ 19
5.
4Create task ^ 20
6.
4Compile PLC program code ^ 20
7.
4Establish connecon between controller and »PLC Designer« ^ 20
8.
4Log in to the controller (load conguraon) ^ 21
9.
4Parameterize controller ^ 22
10.
4Device name ^ 25
11.
4Start PLC program ^ 24