LCDBBPRIG03Sept08
50 THE BLUE BOX LT PARTS REPLACEMENT & INSTALLATION GUIDE
DEVICE MANAGEMENT
SCAN BY SERIAL #
ERASE ALL ADDRESSING
AUTO ADDRESSING
SCAN FOR ZERO ID ON
POWER UP: YES
SCROLL UP until the address of the previous DI 14.
is displayed.
Press the address button on the DI CARD. 15.
If the DI “takes” the address, the display will 16.
increment by one (e.g. from “3” to “4”).
To verify the bus recognizes the replacement DI
Card:
Navigate to SCAN BY SERIAL NUMBER screen: 17.
USER MENU > SETUP MENU > RESTRICTED
(PASSCODE 900001) > ADDRESSING –
BUS SCAN> BUS DIAGNOSTICS > MORE
DIAGNOSTICS > DEVICE MANAGEMENT >
SCAN BY SERIAL#
SERIAL# SCAN
BACK FWD |SAVE|
SERIAL# CE80
ADR: 1
LCP
NO ADDRESS COLLISION FOUND
ON THIS CARD
ENTER to begin a system scan.18.
If the screen shows no collisions, DI Card 19.
replacement is complete.
If collisions exist, contact Technical Support.20.
Reconnect all low voltage conductors for contact 21.
closure devices to the low voltage input/output
terminals.
Program the new DI card.22.
CONTROL CARD [MASTER] REPLACEMENT AND
INSTALLATION
To remove a defective Control Card
De-power the Blue Box LT by switching off the 1.
breaker feeding the power supply (the relays in
that panel will close).
Once the panel is de-powered, disconnect all 2.
cables connected to the control card.
Pry the Control Card out of the plastic track by 3.
applying a flat-blade screw driver to the slot on
the side of the card.
To replace a defective Control Card
Snap the new control card into the plastic track.4.
Re-connect all cables and conductors to the 5.
control card.
Re-power the Blue Box LT6.
After the defective part replacement installation 7.
is complete, return the part using the prepaid
USP return label and envelope to LC&D.
[Note: If the defective part is not returned within a
30-day period, your account will be automatically billed
for the part. ]
Master Control Card
Power