ND30-09D 3 User's manual
4. plug with 16 screw terminals 1 pc
5. plug with 14 screw terminals 1 pc
6. user's manual 1 pc
Fig. 1. Meter set
3 BASIC REQUIREMENTS, OPERATIONAL SAFETY
In terms of operational safety the controller meets the requirements of the
EN 61010-1 standard.
Remarks concerning safety:
The meter should be installed and connected only by a qualified
personnel. All relevant safety measures should be observed during
installation.
Always check the connections before turning the meter on.
Prior to taking the meter housing off, always turn the supply off and
disconnect the measuring circuits.