38
7. Raise the working tongue “A” Fig. 60,
from the handles “C”, attach with the
bolt “B” and the lock.
8. Place the transport tongue “A” Fig. 61
in the chassis left side with the bolt “B”
and the lock.
B
A
When the machine is been transported
in thjis position, the PTO shaft “A” Fig.
62, must be placed in the hooks “B” of
the basket located inside the tunnel.
FIG.60
FIG.61
FIG.62
Execute this raising task between al
least two people.