Swing-away lattice
3.3 Rigging work checklists
3 - 10 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
3.3.3 CHECKLIST: Removing the 10 / 17 m (33 / 56 ft) swing-
away lattice
H
This checklist is no complete set of operating instructions. There are accom-
panying operating instructions which are referred to by cross-references.
Observe the warnings and safety instructions specified there.
Prerequisites:
The truck crane is on outriggers or the main boom has been set down on
the boom rest.
An auxiliary crane is available.
With rigged
swing-away
lattice
This checklist only applies if the swing-away lattice is rigged. If the swing-
away lattice is folded on the side of the main boom, the
With folded swing-
away lattice
checklist applies; à p. 3 - 12.
H
If the swing-away lattice is to be transported while folded and crane work
was only carried out with section 2, you should first unrig the swing-away
lattice and then remove it:
à CHECKLIST: Unrigging the 10 / 17 m (33 / 56 ft) swing-away lattice, p. 3 - 21,
à With folded swing-away lattice, p. 3 - 12.
1. Carry out all rigging work from the
CHECKLIST: Unrigging the 10 / 17 m
(33 / 56 ft) swing-away lattice
up to and including point 18.; à p. 3 - 24.
2. Undo the electrical connection;
à p. 3 - 62.
3. For derricking swing-away lattice, disconnect the hydraulic connection;
à p. 3 - 35