EasyManua.ls Logo

Manitowoc GROVE GMK 4100 - Page 82

Manitowoc GROVE GMK 4100
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Swing-away lattice
3.3 Rigging work checklists
3 - 12 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
With folded
swing-away
lattice
This checklist only applies if the swing-away lattice is unrigged. If the swing-
away lattice is folded in front of the main boom, the checklist
à With rigged
swing-away lattice
, p. 3 - 10 applies.
1. For derricking swing-away lattice, disconnect the hydraulic connection;
à p. 3 - 35
2. Undo the electrical connection;
à p. 3 - 62.
3. Sling the swing-away lattice onto the auxiliary crane and attach a guide
rope tot the front of section 1;
à Slinging points, p. 2 - 5.
4. If the 10 m (33 ft) swing-away lattice is folded on the side:
Undo the connection between
section 1 and the main boom in the
Rear area; à p. 3 - 47.
Undo the connection in the
Front area; à p. 3 - 39.
5. If the 17 m (56 ft) swing-away lattice is folded on the side:
Check whether the connection between section 1 and section 2 in
the
Rear area has been established; à p. 3 - 48.
Check whether the connection in the
Middle area is in the section 1 /
section 2 position;
à p. 3 - 42.

Table of Contents

Related product manuals