EasyManuals Logo
Home>Manitowoc>Construction Equipment>GROVE GMK 4100

Manitowoc GROVE GMK 4100 User Manual

Manitowoc GROVE GMK 4100
286 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #86 background imageLoading...
Page #86 background image
Swing-away lattice
3.3 Rigging work checklists
3 - 16 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
6. Fold out the run-up rail; à p. 3 - 36.
7. Secure the lattice extension with the guide rope;
à p. 3 - 27.
8. Only applies to rigging the 10 m (33 ft) swing-away lattice if only
section 1 is installed.
Undo the connection between section 1 and the main boom in the
Rear area; à p. 3 - 46.
9. Only applies to rigging the 10 m (33 ft) swing-away lattice if section 2 is
also installed.
Bring the connection in the
Middle area into the section 2 / main boom
position;
à p. 3 - 43.
Establish the connection between section 2 and the main boom in
the
Rear area; à p. 3 - 45.
Undo the connection between section 2 and section 1 in the
Rear
area;
à p. 3 - 48.
10. Only applies to rigging the 17 m (56 ft) swing-away lattice.
Check whether the connection in the
Middle area is in the section 1 /
section 2
position; à p. 3 - 42.
Check whether the connection between section 1 and section 2 in
the
Rear area has been established; à p. 3 - 48.
Undo the connection between section 2 and the main boom in the
Rear area; à p. 3 - 45.
11. Swing the lattice extension onto the main boom head;
à p. 3 - 54.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 4100 and is the answer not in the manual?

Manitowoc GROVE GMK 4100 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 4100
CategoryConstruction Equipment
LanguageEnglish

Related product manuals