Preparing for the installation
4 Preparing for the installation
4.1 Before the installation
4.1.1 Required materials and tools
Any special tools required in addition to the standard tools for the
installation and maintenance of the air cannon are indicated at the
corresponding locations.
4.1.2 Preparatory measures
1. Inspect the delivery for the following conditions:
Is the delivery complete? Does the number of pallets/
crates/containers delivered match the number on the
delivery note?
Do all of the transport packages appear to be undamaged?
Does damage to the packaging exist which indicates
damage to the product contained inside?
2. Always record any incompleteness or transport damage
discovered in the delivery and have it confirmed by the shipper.
All damaged products must be kept for inspection.
NOTE
Perform the inspections described carefully and completely.
The shipping company is liable for any transport damage!
Please contact the shipper with any damage claims.