3. Installation and Commissioning of the SPS Working Station
Page 3–4 Operating Manual MB-SPS-System
©
GmbH – Version 4.3 - 06/2010
3.1.4 Installation and Commissioning
We recommend that a MBRAUN technician installs the system and performs the first
commissioning. If the customer does the installation and first commissioning by himself, please
adhere to the following instructions.
3.1.5 Final Inspection
A final inspection and specification test is performed by a MBRAUN technician if the installation is
made by MBRAUN. If the customer does the installation and first commissioning by himself,
MBRAUN recommends performing a complete system and specification test prior to operating the
system.