6. Operating the Working Station (SPS 800 Manual and SPS Compact)
Operating Manual MB-SPS 800 Manual and SPS Compact
©
GmbH – Version 4.3 – 06/2010
Page 6–3
6.2. Activating the System
Preconditions:
Check-up:
> Is the Operating Manual completely worked through and understood?
> Are all connections (working gas, solvent connections) correctly fitted and proved to be leak
free? See chapter 3.3)
> Are the exhausts of the SPS and the vacuum pump correctly connected to the in-house
disposal facility?
> Is the system sufficiently grounded?
> Is a
-protected vacuum pump connected or has the vacuum pump sufficient distance to the
-Zone of the SPS-System?
> Care for the safety instructions and state of the used solvents!
> Is the vacuum pump activated and is the vacuum proved?
(Check upper manometer at the front plate)
> Is the primary pressure correctly adjusted to 4,0 - 6,0 bar ?
> Is the pressure proved at the manometer on the front plate of the SPS? (only SPS 800 manual)
NOTE!
A manometer for the primary inlet operation gas is not part of delivery
(Only SPS compact).
> Is the working pressure of the solvent is correctly adjusted? The pressure is proved at the
manometer of each tapping point and at the pressure reducing valve (valve 5) adjusted
to 0,3 – 0,5 bar.
> Are all components on hand, e.g. sampling vessel, dip etc. ?
> Before activating the SPS-System, all steps of installation and commissioning must have been
completed, as described in chapter 3. The operation manual must have been read and
understood.
If all requirements are fulfilled
► The dispensing procedure can be started (see following chapter).