3. Installation and Commissioning of the SPS Working Station
Page 3–18 Operating Manual MB-SPS-System
©
GmbH – Version 4.3 - 06/2010
Degassing the system
During commissioning and
changing purification columns:
For degassing the system follow the description in
chapter 5.2.4.1 respectively 5.2.4.2
First filling of solvents:
► For filling solvent, please follow the description in
chapter 6.4.2 Steps (1 ) to (4) and 6.4.3 steps (1) to (2).
Note!
According to the volume of the filter column and the kind of solvent it will
take a longer period, until the solvent has permeated the filtrate and will
leave at the tapping point.