EasyManua.ls Logo

MCCOY KT5500 - Page 79

Default Icon
109 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80-0420-23 POWER TONG
Manual № TM12012
Section 5
Page 5.21
©2008-2017 McCoy Global
Maintenance
5.11 TUBULAR CONNECTION EQUIPMENT RE-COMMISSIONING PROCEDURE (CONTINUED):
18.
Perform a full functional test of the equipment including, if applicable, backup components and float frame
components. Report and correct any hydraulic leaks from the hydraulic valve bank, or from any hydraulic
cylinders that are used.
19.
While rotating the cage plate, ensure that the jaws properly cam. If the jaws do not cam properly, the brake bands
require tightening. See Page 5.7 for instructions for adjusting the brake bands.
20.
When all of the previous steps are completed, you may return your re-commissioned equipment to service.

Table of Contents