EasyManua.ls Logo

Millipore Milli-Q Integral 3 - Consumables; Reservoir location

Millipore Milli-Q Integral 3
153 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
Specifications and requirements, Continued
Consumables
The minimum consumables required for installation are listed here.
Note that these items are not shipped with the Milli-Q System and must be
ordered separately:
Progard Pack,
Quantum Cartridge, and
POD Pak.
Reservoir
location
The Reservoir must be located relative to the Milli-Q Cabinet:
0 y 2 metres, where y = vertical distance, and
0 x 3 metres, where x = horizontal distance.

Related product manuals