EasyManua.ls Logo

Millipore Milli-Q Integral 3 - Page 92

Millipore Milli-Q Integral 3
153 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
92
Lab Closed feature, Continued
Procedure
(continued)
Step Action
4
Place a piece of tubing between a valve on the bottom of the
Reservoir and a sink or drain.
Open the valve.
NOTE:
Do not place the tubing directly into a drain. This helps to
minimise bacterial contamination.
Closing tank
valve
Follow the steps below to exit LAB CLOSED Mode.
Step Action Diagram
1 The Milli-Q System is in Lab
Closed Mode.
2
Go to STANDBY Mode.
The Milli-Q System exits
LAB CLOSED Mode.
3 Go to READY Mode.

Related product manuals