EasyManua.ls Logo

Mitsubishi Electric NZ2EX2B-60AD4 - Page 143

Mitsubishi Electric NZ2EX2B-60AD4
254 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
141
CHAPTER 8 FUNCTIONS
8
8.16 CC-Link IE Field Network Synchronous Communication Function
(5) Setting procedure (A/D converter module)
1. On the "CC IE Field Configuration" window, select the main A/D converter module from "List of
stations", and set the values as follows:
When the master station is the simple motion module, set "Station No." to 17 or more.
In "RX/RY Setting", make an assignment of 32 points.
In "RWw/RWr Setting", make an assignment of 16 points.
2. Open the "Parameter Processing of Slave Station" window, and set "Method selection" to
"Parameter write".
"CC IE Field Configuration" window Select the main A/D converter module from "List of stations"
[CC IE Field Configuration] [Online] [Parameter Processing of Slave Station]
3. In "Station parameter", set "Mode switch" to "9: Automatical judgment mode".
4. In "Basic module parameter", set "CH A/D conversion enable/disable setting" to "0: Enable".
5. Click button to write the parameters to the A/D converter module.
6. Check that "0920H" is stored in Latest warning code (RWr1).
[Online] [Monitor] [Device/Buffer Memory Batch]
7. Turn off and on the module power supply or perform remote reset to operate the A/D converter
module in synchronous communication mode.
For the extension A/D converter module, make the settings for each item of "Ext. module 1_Module parameter".

Table of Contents

Related product manuals