CHAPTER 4 PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
*1 To replace the module, refer to the point below.
To replace the module, follow the procedure described below:
Turn off the module power supply and remove the A/D converter module.
Prepare a new A/D converter module and follow the illustration above as instructed from "Setting a station
number" to "Parameter settings and programming". (No re-setting of network parameters of the master station is
required.)
If necessary to use the user range, perform the offset/gain setting.
Carry out operation check and then restart the control.
Page 50, Section 6.1
Page 51, Section 6.2
Page 53, Section 6.3
Page 53, Section 6.3
Page 58, Section 6.4
Page 60, Section 6.5
Page 69, Section 7.1
Page 76, Section 7.2
*1
Page 155, CHAPTER 9
Page 83, Section 7.3
Set the station number of the main A/D converter module.
Setting a station number
Check box
Connection
When using an extension module, connect the extension module to the
main A/D converter module.
After that, mount the main A/D converter module on a DIN rail.
Carry out wiring of a power supply, Ethernet cables, and external
devices to the main A/D converter module.
To use an extension module, carry out wiring of a power supply
and external devices to the extension module.
Wiring
Parameter settings and programming
Set parameters and create a program.
Offset/gain setting
If the user range is necessary, set up the offset/gain setting.