EasyManua.ls Logo

Molift Rail System - Traverse Rail System

Molift Rail System
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
Molift Rail System / www.molift.com
A traverse system is built up by two parallel
primary rails, a secondary rail connected to the
primary rails by a traverse trolley in each primary
rail. The lifting motor is connected in the second-
ary rail. This system allows full room coverage.
Primary rail
Secondary rail
3.2 Traverse System
Secondary Rail mounted
under Primary rails,
under trolley
Secondary Rail mounted
between Primary rails,
on top of trolley (Box-in)

Related product manuals