7.3 Identification
After an approved test load procedure the over-
head system is ready for identification marking.
This marking is made with a decal rail marking
on which the maximum load is to be stated. The
decal must be placed clearly visible on the rail in
the system to which the lift motor is attached.
When a Periodic Inspection of the system is
performed a test symbol will be placed in the
circular area on the rail decal marking. A Periodic
Inspection of the overhead system must be made
at least once a year.
Article no.
110 9 014 MRS Label, SWL
SWL labels are supplied together with end stop.
7.4 Installation Certification
After approved functional and maximum load test
the installation will be finalized by the issue of
Checklist for installation of Molift Rail system as an
installation certificate. The installation certificate
has to be issued by installation personnel author-
ized by Etac.
Decal position for identifica-
tion of SWL for Overhead
system
Molift Rail System installed by authorized personnel.
Date: Etac Molift Service ID SWL: kg
.................. (6 digits):..................... ................ lbs
Periodic
inspection
performed
www.molift.com