Periodic inspection of the rail system should be
undertaken at least once a year to ensure that the
device operate properly and safely.
Periodic inspection Checklist
When performing a periodic inspection, the
inspector shall fill out the inspection report for
Molift Rail System. The reports should be retained
by the person(s) responsible for servicing the hoist.
If the inspection reveals defects and damages,
the owner shall be notified and a Non-conformity
report should be sent to Etac. A new periodic
inspection must be performed after repair.
In the event of damage that jeop-
ardizes the safety of the patient,
the rail system shall immediately
be taken out of service and marked
clearly with “out of order” and
shall not be used until the rail
system is repaired
When periodic inspection is completed the
inspector shall mark the hoist with a sticker on
the control label showing the date when periodic
inspection is performed, and this will then indicate
when next service should be performed.
Any Service or Repair should be documented in
the service log, and verified by using the Checklist
after service and repair.
Checklist after Service and Repair
Use the checklist to verify that the rail system is
properly installed safe before use. Document the
job by signing the Service Log.
Service Log
Defects and damage of importance to the safety
of the Rail system which have occurred between
inspections and have already lead to corrective
actions should be entered in the Service logbook.
A record of the date of inspection of the hoist and
inspection result should be noted in the logbook
together with a short description of the incident
and the signature of the inspector.
This will enable the owner and service partner
to see previous history for the rail system and in
that way maybe making future fault finding and
repairs easier.
10. Maintenance
Mark label
with month
and year of
inspection
Molift Rail System installed by authorized personnel.
Date: Etac Molift Service ID SWL: kg
.................. (6 digits):..................... ................ lbs
Periodic
inspection
performed
www.molift.com
Installation Checklist
Periodic inspection
checklist
Inspection
label
Service and repair
checklist
Service log
OK
FAIL
OK
Service required
every 12 months
Figure: Documentation of maintenance flow chart.