EasyManua.ls Logo

Molift Rail System - Page 69

Molift Rail System
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
69
Molift Rail System / www.molift.com
Checklist for installation of Molift Rail system
Installation Certificate
Customer:
........................................................................................
...
Room number / Section:
.........................................................................................
.........................................................................................
System should consist of only
original MRS components. If not
Decalaration of conformity is not
valid and Etac is not responisble for
warranty of the system
Checkpoints
N/A OK
All rail system components are fitted according to applicable installation instructions.
Check that there is no shavings after drilling or cutting or other objects in the rail
Clean after mounting
The trolley / hoist is to run smoothly and without any noise through the entire rail system
All rail ends in the system have been fitted with end stops and end covers.
All end stop screws are tightened to 40 Nm/ 30 ftlbs
Performed at least six lifts (lift height approx. 15 cm/6 inches) with load = system SWL
at randomly selected points along the rail. The trolley/lift runs smooth through the entire
system with load=SWL and:
transition coupling
switch
The hoist fitted to the system has the same or lower SWL
The hoist is checked seperately according to Hoist User manual.
The system is correctly marked with SWL label, with date and a valid signature and certifi-
cate number by the authorized installer.
All parts and components which before, during or after installation are damaged,
deformed or are otherwise defective must be replaced or repaired before the
system can be brought into use!
Performed by
Installation must be performed by a person who is certified by Etac education.
Date/Place:
...........................................................................................
Signature:
...........................................................................................
Etac Molift Service ID (6 digits):
...........................................................................................
Comments:

Related product manuals