Installation 4-12DXL5000 User and Technical Manual
Table 4-7: CHAN1 and CHAN2 DATA Connector Pin-Outs
4.9 Initial Power Up/Power Down
When the wiring and installations are completed, it is time to
power up the DXL5000 system. As good practice, you should
make a final check of all wiring and hardware installations before
power is applied.
4.9.1 Checks Before Power-Up
CAUTION
Be sure the power being supplied matches
the power required by the equipment.
Here are your final pre-power-up checks:
• Double check to verify all cables are connected to the
correct connectors.
• Make sure all connections are fully mated, properly
mated, and are secured.
Connector
Information
Pin
CHAN1
Signal
Description
CHAN2
Signal
Description
RJ-45 Connector. 1 ETH1_DA_P ETH0_DA_P
2 ETH1_DA_N ETH0_DA_N
3 ETH1_DB_P ETH0_DB_P
4 N/C N/C
5 N/C N/C
6 ETH1_DB_N ETH0_DB_N
7 N/C N/C
8 N/C N/C
1 2 3 4 5 6 7 8
4.9.2 Initial Power-Up
Now you are ready to apply power:
1. Power up the DXL5000 System per “Powering the
DXL5000 System Transmitter” on page 2-6 and/or
“Powering the DXL5000 System Receiver” on page 2-
7.
Note
The following steps must be performed by the
System Administrator.
2. Perform “Initial DXL5000 System Setup” on page 2-9
to establish the DXL5000 System IP, Subnet Mask,
and Default Gateway addresses required to operate
from a local or remote PC or laptop.
3. Perform “User Name and Password Setup” on page 2-
24 to set up user names and passwords.
4. If everything appears to be normal, test the
performance of your DXL5000 System by setting up a
link and transmitting and receiving video and audio.
- If you have any problems, refer to the
“Troubleshooting” Chapter on page 3-1.
4.9.3 Power Down
To remove power from the DXL5000 System, perform “Powering
the DXL5000 System Transmitter” on page 2-6 and/or “Powering
the DXL5000 System Receiver” on page 2-7.