EasyManua.ls Logo

MRC DXL5000 RX - Initial DXL5000 System Setup

MRC DXL5000 RX
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation 2-9DXL5000 User and Technical Manual
Power Down
The steps required to properly power down the DXL5000 System
Receiver are contained in the following steps.
1. Select the Log Out tab and observe the Log In screen
is displayed.
2. Remove facility power from the DXL5000 System
Receiver.
2.4 Initial DXL5000 System Setup
To log into the DXL5000 System Transmitter or Receiver
software for the System Administrator to set up IP, Subnet Mask,
and Default Gateway addresses, see Figure 2-3 on page 2-10.

Table of Contents