EasyManua.ls Logo

NEC Express5800 140He - STEP 3 TURNING SERVER POWER OFF

NEC Express5800 140He
398 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
G-8
STEP 3 TURNING SERVER POWER OFF
Turn off the power of the server in the following procedure:
1. Schedule the jobs required to convert the server configuration for the tower model to that for the rack mount
model (if the server has already been used in the configuration for the tower model).
2. Back up the important data saved in the server using the procedure defined by the server OS (if the server has
already been used in the configuration for the tower model).
IMPORTANT: Before starting the conversion of the server configuration for the tower
model to that for the rack mount model (or vise versa), back up the important data saved in
the server.
3. Set the server to the offline status using the procedure defined by the network OS (if the server has already
been used in the configuration for the tower model).
4. Release the key lock on the front door and open the front door.

Table of Contents

Related product manuals