EasyManua.ls Logo

NEC Express5800 140He - STEP 5 INSTALLING RACK CONVERSION KIT ON SERVER

NEC Express5800 140He
398 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
G-15
STEP 5 INSTALLING RACK CONVERSION KIT ON SERVER
IMPORTANT: A number of sensitive electronic parts are installed in the server. To
prevent the parts from being damaged by discharge of static electricity accumulated in your
body, make a part of your body contact with a grounding screw at a connector on the server
or an peripheral or an unpainted frame to discharge the static electricity before starting the
job.
Install the following components of the Rack Conversion Kit on the server in the following procedure:
Rack base assembly
Rack bracket (L/R)
Handle (L/R)
Memory slot cover
Installing Rack Base Assembly
Install the rack base assembly on the server in the following procedure:
1. Align the rack base assembly with studs on the server, then slide the rack base assembly to the rear side of the
server to install it.
2. Fix the rack base assembly with a screw (A).
Stud
Rack base assembly
Installing Rack Brackets (L and R)
Install the rack brackets (L and R) to the server in the following procedure.
1. Place the server so that the left side of the server faces upward. Mount a screw (A) to the other side of the rack
base assembly.

Table of Contents

Related product manuals