Chapter 4: Wall Installation
This chapter describes storage and unpacking instructions, preliminary tests, tools,
materials, site selection, and the wall installation procedure for the R900 cellular endpoint.
Prior to Installation
Any existing network registers must be reprogrammed.
Storage
Unpacking
After receipt, inspect the shipping containers for damage, and inspect the contents for
damage prior to storage.
After completing the inspection, store the cartons in a clean, dry environment.
The R900 cellular endpoint has an internal battery and storing it for more than one year
can affect product life. Be sure to use a first-in, first-out inventory control system. For
more information, see "Environmental" on page 4.
Handle the R900 cellular endpoint carefully; however, no additional special handling is required.
After unpacking the R900 cellular endpoint, inspect it for damage. If the R900 cellular
endpoint appears to be damaged or proves to be defective upon installation, notify
your Neptune sales representative. If one or more items requires reshipment, use the
original cardboard box and packing material.
The R900 cellular endpoint does not have networking capability