18
R900 cellular endpoint Wall and Pit MIU Installation and Maintenance Guide
Chapter 4: Wall Installation
7.
Continue to guide the remaining wire through the cable exit notch at the bottom right
side of the R900 cellular endpoint.
Figure 17 – Cable Exit Notch
Completing and Testing the Installation
Follow this procedure to complete and test the installation.
1.
Slide the tongue on the top of the R900 cellular endpoint into the groove on the
top of the mounting adapter.
2.
Secure the R900 cellular endpoint to the mounting adapter using the set screw.
Figure 18 – Securing the Mounting Adapter