Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person. Fill in the page for information about installation data in the User
manual.
DateSignatureNotesDescription
Ventilation (page 18)
Setting the ventilation flow
Connecting ground cables
Heating medium (page 16)
System flushed
System vented
Circulation pump setting
Setting heating medium flow
Boiler pressure
Electricity (page 19)
Fuses heat pump
Fuses property
Outside sensor
Room sensor
Current sensor (only copper version)
Safety breaker
Earth circuit-breaker
Warranty
NIBE™ F370Chapter 1 | Important information6

Other manuals for Nibe F370

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nibe F370 and is the answer not in the manual?

Nibe F370 Specifications

General IconGeneral
TypeExhaust Air Heat Pump
RefrigerantR290
Energy classA++
Energy Efficiency Class (Space Heating, 35°C)A++
Energy Efficiency Class (Space Heating, 55°C)A+
ApplicationResidential
Hot Water Tank Volume170 l
Heating Power8.5 kW

Related product manuals