EasyManuals Logo

Omron E5AR - MANUAL 2 User Manual

Omron E5AR - MANUAL 2
343 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #78 background imageLoading...
Page #78 background image
4.3 Initial setting examples
4-7
Settings Required
for Basic Control
Set alarm value 1with
the UD keys
Set alarm value 2 with
the UD keys
Present value (PV) /
SP / MV
Bank No.
0: Bank No. 0
Adjustment level
Display bank selection
0: Bank No. 0
Bank No. 0 alarm value 1
0.0
5
.
.0 :5.0°C
Bank No. 0 alarm value 2
0.
.
0200
.
.0 :200.0°C
Less than 1 second
Less than 1 second
Less than 1 second
Less than 1 second
Less than 1 second
Run AT with UD keys
Change the control period
with UD keys
Control period (heat)
20.00.5:0.5 seconds
AT Execute/Cancel
off0:AT run
5, Change control period
6, Set alarm value 1
8, Set SP
9, Run AT
Start operation
10, Start operation
Set SP with UD keys
Present value (PV) /
SP / MV
0.0150.0:150.0°C
4. Auto tuning (A.T)
Refer to page 4-19
RUN level
Bank No.
0: Bank No. 0
Bank setting level
Verify that the display
bank selection is 0
Display PID selection
1:PID set No.1
Present value (PV) /
SP / MV
l.adj
l.bnk
l.adj
After AT ends
AT run in progress
Less than 1 second
25.0
0.0
0.0
l.adj
bank
0
l.adj
cp
0.5
M
l.bnk
d.bnk
0
l.bnk
0.al-1
5.0
l.bnk
0.al-2
200.0
M
M
l.pid
d.pid
1
l.pid
RUN level
25.0
150.0
Adjustment level
l.adj
bank
0
l.adj
at
off
M
RUN level
l.adj
at
0
l.adj
at
off
7, Set alarm value 2
Control begins
Control begins
indicates that the key
is pressed several times to
switch to desired setting data.
0.0
50.0
150.0
150.0
PID setting level

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Omron E5AR - MANUAL 2 and is the answer not in the manual?

Omron E5AR - MANUAL 2 Specifications

General IconGeneral
BrandOmron
ModelE5AR - MANUAL 2
CategoryController
LanguageEnglish

Related product manuals