3-8 Installing the Controller Link Interface Unit 
● Connecting and Disconnecting 
 
1.  Mount the Connector Conversion Board onto the back of the PT so that its expansion in-
terface connector is inserted into the expansion interface connector on the back of the PT 
and the respective screw holes are aligned. Hold the Board by the corners keeping it p
allel to back of the PT. 
ar-
 
PT’s expansion 
interface connector 
Connector Conversion 
Board 
Connector Conversion Board’s 
expansion interface connector 
Hold the four corners and insert straight 
to the expansion interface connector on 
the PT. 
Align the positions of the holes
 
 
2.  Secure the four corners of the Connector Conversion Board with screws. 
 
 
 
 
3-44