Delivery, internal transport, unpacking
Version 1.0.2 dated 2018-03-02 Page 23Translation of the original instructions
DH45V GB
DH45V_GB_3.fm
OPTIMUM
MASCHINEN - GERMANY
®
3.3 Unpacking
Install the machine close to its final position before unpacking. If the packaging shows signs of
having possibly been damaged during transport, take the appropriate precautions to prevent
the machine being damaged when unpacking. If damage is discovered, the carrier and/or ship
-
per must be notified immediately so the necessary steps can be taken to register a complaint.
Examine the complete machine carefully and check whether all materials, such as shipping
documents, instructions and accessories have been delivered with the machine.
3.4 Lifting the machine
Reclining transport. Dismantle the side
parts of the box.
Dismantle the fortifications in the box.
Fit a steel rod 30 mm x approx. 600
mm through the hole in the drill head.
Pull up the machine with a suitable lift-
ing device from the box, and set up the
machine on the floor.
The machine can be raised with a lift
truck or forklift truck underneath the
packing case.