Delivery, internal transport, unpacking
Version 1.0.2 dated 2018-03-02 Page 26 Translation of the original instructions
DH45VGB
DH45V_GB_3.fm
OPTIMUM
MASCHINEN - GERMANY
®
3.7.1 Gear
3.7.2 Coolant equipment
3.8 First commissioning
CAUTION!
First commissioning may only take place after proper installation.
WARNING!
The use of improper tool holders or their operation at inadmissible speeds constitutes a
hazard.
Only use the tool holders (e.g. drill chuck) which were delivered with the machine or
which are offered as optional equipment by OPTIMUM.
Only use tool holders in the intended admissible speed range.
Tool holders may only be modified in compliance with the recommendation of OPTI-
MUM or of the manufacturer of the clamping devices.
WARNING!
There is a danger to persons and equipment, if the first commissioning of the geared
drill is carried out by inexperienced personnel.
We do not accept any liability for damages caused by incorrectly performed
commissioning.
„Qualification of personnel“ auf Seite 11
Filler hole
Sight window, dropped oil level