The multi-milling machine is fixed to the floor by four anchor screws which are past through the
machine foot. The dimensions for the anchoring bolts can be seen in the following drawing.
Img.3-3: Anchoring dimensions
Prepare level installation place and the anchoring bolts.
Lift the multi-milling machine and position them above the anchoring bolts.
Carefully lower the multi-milling machine, the anchoring bolts must be introduced through
the holes in the machine foot.
Install washers and nuts on the anchoring bolts.
Check that the multi-milling machine is horizontal using a spirit level on the cross table and
put wedges under the machine foot if necessary.
ATTENTION!
All four corners of the machine foot must lie flat.
Tighten the nuts of the anchoring bolts.
ATTENTION!
If the fixing screws are too tight in particular in connection with an uneven substructure
it may result in a broken stand of the multi-milling machine.
Check the alignment of the multi-milling machine again.