EasyManua.ls Logo

Oracle SPARC T8-1 - Removing Power From the Server

Oracle SPARC T8-1
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Attach the CMA to the Server
Remove the tape that secures the slide rail latching bracket to connector D and ensure that the
latching bracket is properly aligned with connector D (panels 1 and 2).
Note - The CMA is shipped with the slide rail latching bracket taped to connector D. You must
remove the tape before you install this connector.
8.
Install the CMA's connector D into the left slide rail.
a.
While holding the slide rail latching bracket in place, insert connector D and
its associated slide rail latching bracket into the left slide rail until connector
D locks into place with an audible click (panels 1 and 2).
Note - When inserting connector D into the slide rail, the preferred and easier method is to
install connector D and the latching bracket as one assembly into the slide rail.
b.
Gently tug on the left side of the CMA's slide bar to verify that connector D is
properly seated.
Installing the Server 45

Other manuals for Oracle SPARC T8-1

Related product manuals